EV charging points in Peterborough

Chargers sized to your requirements and your available spare capacity — from a single home unit to a managed depot array, installed and certificated properly.

Charging that fits the supply

Home, workplace and fleet installations

Various sizes of EV charger are available depending on what you need and what your incoming supply can carry. We survey first, then recommend.

Home charging

Wall-mounted chargers installed with the correct earthing arrangement, RCD protection and a tidy cable route — sized to what your incoming supply can actually deliver.

  • Tethered or socketed units
  • Load curtailment where needed
  • Smart charging & app setup

Workplace & visitor bays

Multi-bay installations for staff and customer parking, with back-office billing, access control and phased expansion designed in from day one.

  • Single or three-phase units
  • Billing & access platforms
  • Future-proofed containment

Fleet & depot charging

Higher-power charging for vans and HGV support fleets, including dynamic load management so overnight charging never trips the site supply.

  • Dynamic load management
  • DNO applications handled
  • Sequenced overnight charging

Our process

From survey to switch-on

A structured approach that avoids the two classic EV mistakes: an undersized supply and an oversized promise.

  • Site survey and incoming supply check
  • Maximum demand and spare capacity assessment
  • Charger sizing and unit recommendation
  • DNO notification or application where required
  • Cable routing, containment and civils
  • Load management configuration
  • Earthing arrangement and protection design
  • Commissioning, testing and certification
  • App, billing and access handover

FAQs

EV charging questions

What size EV charger can I have?

It depends on your available spare capacity, not just what you would like. Domestic single-phase installations are usually 7.4kW; premises with three-phase can take 11kW or 22kW units; depot and forecourt sites can support rapid DC chargers. We survey the incoming supply and existing load before recommending a size.

What if there isn't enough spare capacity?

There are usually three options: fit load management so the charger throttles when the building demand peaks, apply to the DNO for a supply upgrade, or install more, lower-powered points that charge over a longer window. We will set out the cost of each rather than defaulting to the most expensive.

How long does installation take?

A straightforward domestic charger is typically half a day. Workplace installations with multiple bays, trenching or new sub-mains run from a couple of days to a phased programme, which we confirm at quotation stage.

Do you install any brand of charger?

We install the mainstream manufacturers and are happy to fit a unit you have already chosen. If you have no preference, we will recommend units we know are reliable in the field and easy to support.

Size up your charging

Tell us how many vehicles, where they park and how long they sit — we will design a charging solution around the capacity you actually have.